HEC-RAS Analysis
Flooding can happen whenever flowing water surpasses its bank full stage and eventually inundate the surrounding adjacent areas. These may perhaps take place during the... Learn More
Construction d’un hôpital
On account of inadequate regional healthcare facility at Assab, In January 2000, the Southern Red Sea regional Eritrean Defense Force (EDF) needed to construct a... Learn More
Construction de barrage
In 1997, a dam was commissioned by the Ministry of Agriculture (MOA) to be built at Halhal village. The intention was to conserve water in... Learn More
Irrigation de surface
In 1996, the dam had already been completed and the next assignment was to construct the irrigation canals below (d/s) the dam. Figure 1 shows... Learn More